As stated in tender document.
1. Maintenance (Overly) of BC Road Starting from Ful Amer Tol to Kukrul Zero Point. Ch. 0.0-1250.0m. W- 04. 2. Upgrading of RCC Road at Islampur Masterpara Main Road to H/0 Engineer Hamidul. Ch. 0.0-180.0m. W¬23. 3. Construction of RCC Drain at Islampur Masterpara Main Road to RIO Engineer Hamidul. Ch. 0.0-180.0m. W-23. 4. Rehabilitation of Road at RCCI More Jomshed Uddin Sorony Road. L=194.00m With Link-1=156.00m. Link-1a=33.00m. W-25. 5. Maintenance (Overly) & Widening Maintenance of Bituminous Carpeting Road Starting from R.K Road 20 Mega Watt to Borobari Morictari Road & Construction of RCC Road ch.0.0-2390.0m (W-15). 6. Construction of Special Palisading At R.K Road 20Mega Watt to Borobari Morictari Road at ch.1590.0-1660.0m=70.0m (w-15). 7. Construction of Box Culvert Work 02nos 3.Omx3.Om At R.K Road 20 Mega Watt to Borobari Morictari Road at ch.460.0m & ch,1790.0m (w-15). 8. Environmental & Social Safeguard.