1. Tenderer must be registered on e-GP Portal with a valid trade license, TIN certificate. 2. Tenderer must submit similar nature work certificate, annual construction turnover certificate and liquid assets certificate. 3. Payment will be made according to the availability of the fund. In that case no extra claim will be entertained. But the work must be done within given time. 4. Any individual Tender/Bangladeshi Tenderer(s)/firm (s) who fulfill the qualification(s) criteria stipulated in the Tender Document PPA-2006 and PPR-2008. 5.Tenderer must submit line of credit certificate in PW3-7 prescribed format which is to be uploaded in section 7. 6. Additional conditions has been uploaded in section 7 and section 8 which must fulfilled by the tenderer. 7. If the amount quoted by tenderer is more than 10% above or less than 10% below than the official estimated cost, the submitted tender will be treated as non-responsive. 8. The Tender must comply with the instructions/office orders/circulars issued by BWDB in connection with Re-excavation Work.
9. All the information, clarification and documents submitted by the tenderer must comply with declaration given.
10. Tenderer shall own or have proven access to hire or lease of the major construction equipments, in full working order (required documents must be submitted).
SKR-1 Re-excavation of Shuvadya Khal from km 0.00 to km 14.260 total 14.260km in c/w Re-excavation of Shuvadya Khal along with Development and Protection of it's both Banks at Keraniganj Upazila in Dhaka District.(1st Phase) project in Upazila Keraniganj, Dist. Dhaka under Dhaka WD Divivion, BWDB, Dhaka during the FY 2023-24 to 2025-26.