| Brief Description of Works : |
ON CD branch : Construction of ballast protection wall at K.M. 11/5-6 (Left side)-200'-0'', K.M. 11/5-6 (Right side)-328'-0'' , K.M. 11/6-7 (Left side)-300'-0'', K.M. 11/6-7 (Right side)-320'-0'', K.M. 11/7-8 (Both side)-400'-0'', K.M. 11/8-9 ( Right side)-200'-0'', K.M. 11/9-12/0 (Right side)-100'-0'', K.M. 12/6-8 (Left side)-300'-0'', K.M. 12/6-8 (Right side)-150'-0'', K.M. 12/8-9 (Right side)-140'-0'', K.M. 12/9-13/0 (Left side)-135'-0'', K.M. 12/9-13/0 (Right side)-125'-0'', K.M. 13/0-13/1 (Right side)-300'-0'', K.M. 13/1-2 (Left side)-150'-0'',K.M. 13/1-2 (Right side)-100'-0'', K.M. 13/2-3 (Left side)-300'-0'', K.M. 13/2-3 (Right side)-100'-0'', K.M. 13/3-4 (Left side)-150'-0'', K.M. 13/3-4 (Right side)-180'-0'', K.M. 13/4-5 (Both side)-500'-0'', K.M. 13/5-6 (Both side)-400'-0'', K.M. 13/6-7 (Both side)-400'-0'', K.M. 13/7-8 (Left side)-300'-0'', K.M. 13/8-9 (Left side)-170'-0'', K.M. 13/8-9 (Right side)-300'-0'', K.M. 13/9-14/0 (Both side)-640'-0'', Total=6588'-0'' in between SLHR-GMDI. station including repairs to cess & bank and other allied works as per drawing. No-CE/E-10249.
|