As per TDS.
Construction of Bank protection works with channel training and construction of RCC of floor & wing wall at Bridge No. 4/G (km 383/9-384/0 ) in between Parbatipur- Kholahati and & bridge no. 8/G( km 388/4-5) in between Kholahati- Badargonj as per drawing with other ancillary works.