View IFT /PQ / REOI / RFP / PPS Notice Details
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | For More Competition |
| Field Name | Old Value | New Value |
|---|---|---|
| Eligibility of Consultant | As per TDS |
As per TDS |
| TDS/PDS--C. Qualification Criteria-- | The required average annual turnover shall be greater than Taka 16.75 (sixteen point seven five) crore over the last 05 [years counting backward from the date of publication of IFT in the newspaper] [ the required average annual construction turn over is recommended to be about twice the estimated annual cash flow for the Contract; however the multiplier may vary from 1.0 to 2.0, the larger the Contract size the lesser the multiplier should be. The period may be best three (3) years in the last five (5) years or best five (5) years in the last ten (10) years (as appropriate) ; years counting backward from the date of publication of IFT in the newspaper] Example:
The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Taka 4.50 (four point five zero) crore [usually the required liquid asset is the equivalent of 2-6 months payment flow at the average construction rate (straight line distribution), accessible or available after taking into account the financial requirements of existing commitments. The actual period will depend on the speed with which the PE will pay the Contractor’s monthly certificate, allowing time to prepare an invoice, for the Project Manager’s time to certify it, and at least one month contingency for preparing the cheque and making actual payment. Example:
Therefore, the minimum required liquid asset will be Tk 4 Cr., i.e. 3 months cash flow based on the above assumptions.] |
The required average annual turnover shall be greater than Taka 15.50 (fifteen point five zero) crore over the last 05 [years counting backward from the date of publication of IFT in the newspaper] [ the required average annual construction turn over is recommended to be about twice the estimated annual cash flow for the Contract; however the multiplier may vary from 1.0 to 2.0, the larger the Contract size the lesser the multiplier should be. The period may be best three (3) years in the last five (5) years or best five (5) years in the last ten (10) years (as appropriate) ; years counting backward from the date of publication of IFT in the newspaper] Example:
The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Taka 4.50 (four point five zero) crore [usually the required liquid asset is the equivalent of 2-6 months payment flow at the average construction rate (straight line distribution), accessible or available after taking into account the financial requirements of existing commitments. The actual period will depend on the speed with which the PE will pay the Contractor’s monthly certificate, allowing time to prepare an invoice, for the Project Manager’s time to certify it, and at least one month contingency for preparing the cheque and making actual payment. Example:
Therefore, the minimum required liquid asset will be Tk 4 Cr., i.e. 3 months cash flow based on the above assumptions.] |
| Brief Description of Goods,Works or Service | Package-107: Construction of Multipurpose Building at Dhupkhola Maath under Dhaka South City Corporation Lot-01 (Remaining works) |
Package-107: Construction of Multipurpose Building at Dhupkhola Maath under Dhaka South City Corporation Lot-01 (Remaining works) |