As per STD e-PW3-D from e-GP Portal
Upgrading of RCC Road, Uni-block Road & Construction RCC Drain Work From Part-A. Uni-block Road Work From Muslimpara Mr. Hasam House to Mr. Babu House (Ch0.00-265.00m) Link-1: Uniblock Road From Muslim Para Primary School (ch 180.00-215.00m) Link-2: Uniblock Road From Shaju House to Mr. sharjet House (Ch 235.00-315.00m) Word No -08, Part -B: RCC Road With RCC Drain Work from Master Para Pouro Water Pump to Sarif Uddin House (Ch 0.00-150.00m), Link-1: RCC road With RCC Drain from Kalipodo School to Mr. Malak House (ch 0.00-160.00m) Word No-04, Part-C: RCC Road From South Hospital Para Mr. Hasan Shop to Mr.Moshur House (Work Assistant) (Ch 0.00-180.00m) Word No-02. Part :-D: HBB Road work from Bokchor Para Makal Road to Siful House (Ch 00-310.00m) (Ward No-08) Under Chuadanga Pourashava.