View IFT /PQ / REOI / RFP / PPS Notice Details
|
Amendment / Corrigendum No. : 2
|
|
| Amendment / Corrigendum Text : | Correction of Submission form (SL No 5, Section 8.4 Appendix D Form eTSL_Modified e-Tender Submission Letter) Note: The bidder need not mention the total price of the bid, excluding any discounts, as instructed in ITT clause no. 25 and in the form mentioned in Section 8.4 Appendix D Form eTSL_Modified e-Tender Submission Letter. The bidder needs to submit & follow the form as amended. If the bidder mentions the total price of the bid in Section 8.4 of Appendix D of Form eTSL_Modified e-Tender Submission Letter, the bid will be rejected. The bidder's total price will be automatically generated by the e-GP system from Section 6: Bill of Quantities. |
| Amendment / Corrigendum/ Addendum No. : | 2 | ||||
| S. No. | File Name | File Description | File Size (in KB) |
||
|---|---|---|---|---|---|
| 1 | Section 8.4 Appendix D Form eTSL_Modified e-Tender Submission Letter.docx | Submission Letter | 60310 | ||
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | Correction of BOQ |
| Field Name | Old Value | New Value |
|---|---|---|
| Eligibility of Consultant | As Per TDS |
As Per TDS |
| Brief Description of Goods,Works or Service | The Package includes construction, reconstruction or renovation of 94 Community toilet-bathing Units at 94 sites in 09 different LICs (Low Income Communities) of Dhaka city under DESWS Project. This Package comprises 75 Units of new construction or reconstruction and 19 Units of renovation works. The newly constructed Units have a total 240 chambers including 154 toilet chambers and 84 bathing chambers. The LICs under this Package exist within MODE Zone 4 and 10 of Dhaka WASA. The design of each community toilet-bathing WASH block comprises septic tank, soak-well, superstructure, ram /stair (as applicable), electrification, running water system, etc. The selected construction sites are situated within the LICs where transport can enter seldom from adjacent roads; therefore, construction materials need to be carried manually to the sites in most cases. |
The Package includes construction, reconstruction or renovation of 94 Community toilet-bathing Units at 94 sites in 09 different LICs (Low Income Communities) of Dhaka city under DESWS Project. This Package comprises 75 Units of new construction or reconstruction and 19 Units of renovation works. The newly constructed Units have a total 240 chambers including 154 toilet chambers and 84 bathing chambers. The LICs under this Package exist within MODE Zone 4 and 10 of Dhaka WASA. The design of each community toilet-bathing WASH block comprises septic tank, soak-well, superstructure, ram /stair (as applicable), electrification, running water system, etc. The selected construction sites are situated within the LICs where transport can enter seldom from adjacent roads; therefore, construction materials need to be carried manually to the sites in most cases. |