Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | Due to poor internet connection all over the country the tender opening has been postponed as per request of multiple interested bidders. |
| Field Name | Old Value | New Value |
|---|---|---|
| Eligibility of Consultant | 1. All the tenderers/firms must be registered with CPTU through e-GP portal. Special Instruction: 1. The work may be totally dropped, decreased or increased. No claim or extra rate will be entertained for cancellation of the tender or issuance of a work order with a decreased quantity of work. 5. The contractor has to keep video and image records of the work in different stages (before starting, during and after completion) at his own cost and submit the same to the office of the Executive Engineer. (Circular attached in Section-7). 6. The cost of all tests (stone chips, cement, sand,geo-bags,geo-textile, cylinder, block core test, etc.) should be carried by the Contractor himself. 7. The completion date of Dec/2025 is subjected to project duration extension approval (The original validity of project is upto Dec/2024). |
1. All the tenderers/firms must be registered with CPTU through e-GP portal. Special Instruction:
1. The work may be totally dropped, decreased or increased. No claim or extra rate will be entertained for cancellation of the tender or issuance of a work order with a decreased quantity of work. 5. The contractor has to keep video and image records of the work in different stages (before starting, during and after completion) at his own cost and submit the same to the office of the Executive Engineer. (Circular attached in Section-7). 6. The cost of all tests (stone chips, cement, sand,geo-bags,geo-textile, cylinder, block core test, etc.) should be carried by the Contractor himself. 7. The completion date of Dec/2025 is subjected to project duration extension approval (The original validity of project is upto Dec/2024). |
| Opening Date & Time | 22/07/2024 11:00 | 29/07/2024 11:00 |
| Last date & time for Tender/Proposal Security Submission | 22/07/2024 10:00 | 28/07/2024 16:00 |
| Closing Date & Time | 22/07/2024 11:00 | 29/07/2024 11:00 |
| Brief Description of Goods,Works or Service | Construction of 3-Vent (Vent Size-1.50m x 1.80m) Regulator on Charkanai Khal in-connection with "Flood Control, Drainage and Irrigation Project at Patiya Upazilla in Chittagong District" in Habilasdwip Union, Upazilla:Patiya,Dist:Chattogram. |
Construction of 3-Vent (Vent Size-1.50m x 1.80m) Regulator on Charkanai Khal in-connection with "Flood Control, Drainage and Irrigation Project at Patiya Upazilla in Chittagong District" in Habilasdwip Union, Upazilla:Patiya,Dist:Chattogram. |